SMC Networks SMC-EZ1024DT Manuel d'utilisateur Page 27

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 32
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 26
C
ABLES
15
Adjusting Existing Category 5 Cabling to Run
1000BASE-T
If your existing Category 5 installation does not meet one of the
test parameters for 1000BASE-T, there are basically three measures
that can be applied to try and correct the problem:
1. Replace any Category 5 patch cables with high-performance
Category 5e cables.
2. Reduce the number of connectors used in the link.
3. Reconnect some of the connectors in the link.
Vue de la page 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32

Commentaires sur ces manuels

Pas de commentaire